Scenario-Based Material-Flow and Circularity Assessment of Deep Renovation Projects

DOI: 10.35490/EC3.2026.246
Abstract: Waste generation in deep renovation is driven by onsite activities and their temporal sequencing and scheduling, yet most existing circularity assessment approaches remain scenario and execution agnostic. This paper proposes a schedule-aware BIM-based approach that integrates activity-zone modelling with precedence-constrained scheduling to enable time-based estimation of material flows and waste generation. Implemented through the Circular Intelligent-based Waste Engine (CIWE), the approach supports activity-level waste estimation and onsite circularity assessment. A multi-residential renovation case in Lille, France is used to compare three renovation scenarios. Results show that renovation sequencing significantly influences waste intensity, recovery potential and circularity outcomes.
Keywords: building information modelling (BIM), Circular Economy, construction and demolition waste, deep renovation, material-flow analysis, schedule-aware modelling
Download paper

Presentation video

Successfully submitted

Your submission has been received. We will review your details and contact you soon.